Progress: September 1- I made the bowl but I need to work on making a more rounded shape with my bowls. September 2- The bowl was too wet to be footed so it is sitting in a bag in my locker. I will open the bag and let it sit over night and then, depending on how wet it is, the next day I'll either foot or take it out of the bag completely. September 6- I footed the bowl today. It's sitting in my locker drying a little more. I'm going to sandpaper it since I didn't get all of the clay I used to hold it in place for footing off. September 9- The bowl is sitting on the shelf waiting to be fired. September 12- I think it is now in and just needs to be fired. It should be out in a few days. September 14- The bowl is out now and is sitting in my locker, I plan to glaze it tomorrow. September 15- I decided to try Raku and that's how I glazed it.