Progress: September 1- I made another bowl that will be my second bowl, it is a little more rounded than the first. But, I still want to work on that. September 2- The bowl was too wet to foot so it is sitting in my locker in a bag. I plan to open the bag after the weekend and foot the next day or take it out of the bag completely depending . September 6- Today I was able to foot today. It is sitting in my locker to dry a little more. I plan on sandpapering the sides a little where there is still some clay that held it still while footing. September 9- It's on the shelf waiting to be fired. September 12- I checked and it looks like it went in, it should be out in a few days. September 14- The bowl is out now and is sitting in my locker, I am hoping to glaze tomorrow. September 15- I decided to Raku it and so I glazed it with those colors.
0 Comments
Leave a Reply. |
Page DescriptionThis page is used to document the progress of my projects. Archives
May 2017
Categories |